Rebecca Pakish Crum wrote:
But from the previous mails we found out, ananda did send the
estimate
before timing out.
So planner set all up to include 5.6 GByte from this host
too. And that seems to be too much for 11976 Mbyte tape
capacity. So planner degraded one of the backups, and planned
an incremental one instead.
I'm not even addressing the timeout issue...that just will not
resolve...
But before timing out, planner got already an estimate. Look in the
amdump file. It took 5.6+ Gbyte in its estimate from www.iclear.com
plus the 5.9 Gbyte from the others plus 150 Mbyte from /var.
And that total amount is over your estimated tapecapacity.
So planner decided to switch one filesystem to an incremental one
before even starting the backups themselves. It does not know that
www.iclear.com will time out.
When the backup was started, www.iclear.com timed out, just as always,
but planner had already given instructions to the driver.
Driver does not come back on the schedule delivered by planner to
notice that suddenly, because some other dump failed, it has enough
room on the tape to do a full instead of an incremental.
Look (or post) the amdump file from that run, and notice the schedule
planner generated.
--
Paul Bijnens, Xplanation Tel +32 16 397.511
Technologielaan 21 bus 2, B-3001 Leuven, BELGIUM Fax +32 16 397.512
http://www.xplanation.com/ email: Paul.Bijnens AT xplanation DOT com
***********************************************************************
* I think I've got the hang of it now: exit, ^D, ^C, ^\, ^Z, ^Q, F6, *
* quit, ZZ, :q, :q!, M-Z, ^X^C, logoff, logout, close, bye, /bye, *
* stop, end, F3, ~., ^]c, +++ ATH, disconnect, halt, abort, hangup, *
* PF4, F20, ^X^X, :D::D, KJOB, F14-f-e, F8-e, kill -1 $$, shutdown, *
* kill -9 1, Alt-F4, Ctrl-Alt-Del, AltGr-NumLock, Stop-A, ... *
* ... "Are you sure?" ... YES ... Phew ... I'm out *
***********************************************************************
|