Hello list,
I'm not sure if this is the right location to ask for help but I must
have a mistake somewhere and not able to get amanda running.
log.XXXXXXX.X:
--------------
DISK planner syse-s7010-002 /home/test
START planner date 20060427
WARNING planner tapecycle (7) <= runspercycle (7)
INFO planner Adding new disk syse-s7010-002:/home/test.
START driver date 20060427
STATS driver startup time 0.098
START taper datestamp 20060427 label DailySet105 tape 0
FAIL planner syse-s7010-002 /home/test 20060427 0 [disk /home/test, all
estimate failed]
FINISH planner date 20060427 time 1.060
WARNING driver WARNING: got empty schedule from planner
INFO taper tape DailySet105 kb 0 fm 0 [OK]
FINISH driver date 20060427 time 1.057
--------------
I'm unable to get over this "all estimate failed" and I was even unable
to find any explanation on amanda.org about this error.
The according part in the amdump.1 file is:
--------------
...
SETTING UP FOR ESTIMATES...
planner: time 0.001: setting up estimates for syse-s7010-002:/home/test
syse-s7010-002:/home/test overdue 13266 days for level 0
setup_estimate: syse-s7010-002:/home/test: command 0, options: none
last_level -1 next_level0 -13266 level_days
0 getting estimates 0 (-2) -1 (-2) -1 (-2)
planner: time 0.001: setting up estimates took 0.000 secs
GETTING ESTIMATES...
driver: pid 1820 executable /usr/libexec/driver version 2.4.5p1
driver: tape size 204800
driver: send-cmd time 0.003 to taper: START-TAPER 20060427
reserving 0 out of 0 for degraded-mode dumps
planner: time 0.050: got partial result for host syse-s7010-002 disk
/home/test: 0 -> -2K, -1 -> -2K, -1 -> -2K
taper: pid 1821 executable taper version 2.4.5p1
...
--------------
I am wondering why there are negative results in this "estimate" process.
Any suggestions?
Arnd
|