WARNING: got empty schedule from planner
2006-04-17 14:33:46
I run a remote backup on a server, but the backup did not suceed and i
got this warning in the error file. Can someone point me in the right
direction. Here the log file:
START planner date 20060417
FINISH planner date 20060417 time 0.003
START driver date 20060417
STATS driver startup time 0.066
START taper datestamp 20060417 label DailySet1-1 tape 0
WARNING driver WARNING: got empty schedule from planner
INFO taper tape DailySet1-1 kb 0 fm 0 [OK]
FINISH driver date 20060417 time 0.164
|
<Prev in Thread] |
Current Thread |
[Next in Thread>
|
- WARNING: got empty schedule from planner,
Pavel Pragin <=
|
|
|