Reclamation of COPY-POOL after DRM plan

bierryf

ADSM.ORG Member
Joined
Sep 12, 2006
Messages
4
Reaction score
0
Points
0
Hi,



I would like externalise as soon as possible the morning volumes outside but the time of reclamation of the pool of copy is too much long.



My procedure was :

- backup stgpool POOL COPY-POOL

- recl stg COPY-POOL THreshold=70 DUration=60

- backup db devc=LTODEVC type=full wait=yes

- exit of the bands via DRM

- return of the bands via DRM

- regeneration of the plan (PREPARE)

- expire inventory



Can the reclamation of the pool of copy be done in the course of the day without that affecting the plan of recovery ?



Sorry for my poor english and thanks in advance for response,

Fr?d?ric.
 
After having studied the question and like anybody did not answer me, here what I think :



The reclamation of the pool of copy can be done in shifted very well after the DRM as from the moment when REUSE DELAY is used.
 
Back
Top