Hi,
I would like externalise as soon as possible the morning volumes outside but the time of reclamation of the pool of copy is too much long.
My procedure was :
- backup stgpool POOL COPY-POOL
- recl stg COPY-POOL THreshold=70 DUration=60
- backup db devc=LTODEVC type=full wait=yes
- exit of the bands via DRM
- return of the bands via DRM
- regeneration of the plan (PREPARE)
- expire inventory
Can the reclamation of the pool of copy be done in the course of the day without that affecting the plan of recovery ?
Sorry for my poor english and thanks in advance for response,
Fr?d?ric.
I would like externalise as soon as possible the morning volumes outside but the time of reclamation of the pool of copy is too much long.
My procedure was :
- backup stgpool POOL COPY-POOL
- recl stg COPY-POOL THreshold=70 DUration=60
- backup db devc=LTODEVC type=full wait=yes
- exit of the bands via DRM
- return of the bands via DRM
- regeneration of the plan (PREPARE)
- expire inventory
Can the reclamation of the pool of copy be done in the course of the day without that affecting the plan of recovery ?
Sorry for my poor english and thanks in advance for response,
Fr?d?ric.