Hi,
I need to change to new server hardware on TSM server ( TSM 7.1. with rhel 6.3 to 7)
I found these methods with :
- migration data disk to tape and backup - restore DB
- and with export node ?
(https://www.ibm.com/developerworks/... Servers from one Operating System to another)
Migration of data from disk to tape take long time ( using dedup on stg file ) and i need to reuse tape to new server.
I would like advise about choosing between these two methods ?
Thanks,
I need to change to new server hardware on TSM server ( TSM 7.1. with rhel 6.3 to 7)
I found these methods with :
- migration data disk to tape and backup - restore DB
- and with export node ?
(https://www.ibm.com/developerworks/... Servers from one Operating System to another)
Migration of data from disk to tape take long time ( using dedup on stg file ) and i need to reuse tape to new server.
I would like advise about choosing between these two methods ?
Thanks,