Upper management wants us to reduce tape consumption and reclaim existing tapes by changing data retention periods. The caveat is, they want to know how much tape we would get back BEFORE we change policy settings. Is there any way (scripts, product, utilities) that we can get this information? I have checked with IBM and they have none. Thanks, Randy