Ordinaryblonde
ADSM.ORG Member
- Joined
- Jun 4, 2008
- Messages
- 8
- Reaction score
- 0
- Points
- 0
The title says it all.
One of my clients sometimes takes a lots of time to perform scheduled backup, I guess he retries to backup files that are in use. Usually it is not a problem, but today I have to do something with TSM server that requires restarting machine, and that client is still backuping.
Not only for today, but also for the future simillar cases, I would like to know how to stop scheduled backup in the less painless manner, and what should I do afterwards to repair possible damage.
Thanks!
One of my clients sometimes takes a lots of time to perform scheduled backup, I guess he retries to backup files that are in use. Usually it is not a problem, but today I have to do something with TSM server that requires restarting machine, and that client is still backuping.
Not only for today, but also for the future simillar cases, I would like to know how to stop scheduled backup in the less painless manner, and what should I do afterwards to repair possible damage.
Thanks!