EKM keys to existing, production SKLM instance

c.j.hund

ADSM.ORG Senior Member
Joined
Jun 22, 2005
Messages
247
Reaction score
4
Points
0
Website
Visit site
Hi all,

I was wondering, is it possible to move keys from an EKM instance over to an existing SKLM instance which already has keys and is in production? I've run the EKM -> SKLM upgrade before, so I know you can move keys that way (so long as your EKM instance is v2.1), but I've never tried moving keys into an existing environment. I'm not even sure if it can be done. IBM redbooks don't seem to cover this scenario.

Sincere thanks,
C.J.
 
Back
Top