Thank you, Phil and Dimitri!
I think Bill's suggestion about AllowMixedPriority will work for me.
Dimitri, I run a lot of backups with the same schedule of which I cannot change at the moment. In the beginning it worked out okay, but some long jobs were added on, and since the jobs run alphabetically I'm faced with the problem of the long jobs starting late because of their name. I am spooling and running 15 jobs concurrently with Accurate turned On on my backups.
Again, thank you for the help!
-craig