Re: Backup stgpool fails
1999-06-16 12:27:07
It's what you set the priority of your jobs at. Storage pool backups should be
highest.
Don Caronna
Bob Brazner <Bob.Brazner AT JCI DOT COM> on 06/16/99 09:18:00 AM
Please respond to "ADSM: Dist Stor Manager" <ADSM-L AT VM.MARIST DOT EDU>
To: ADSM-L AT VM.MARIST DOT EDU
cc: (bcc: Don Caronna/Los Angeles/Ttank)
Subject: Backup stgpool fails
We backup our tape pool daily (backup stgppool tapepool copypool). We have 4
drives which are almost in the state of constant use with stgpool backups,
migrations and space reclamation. If a customer starts a restore when all the
drives are in use, ADSM will cancel the stgpool backup in order to obtain the
needed drive. This means we don't get a complete d/r set for that day. Is
there a tweak that tells ADSM to cancel other stuff (e.g., space reclamation or
migrations) instead of stgpool backups? Are there other methods to prevent
dynamic (i.e., customer-initiated) actions from interfering with planned
production operations?
----------------------------------