ADSM-L

Re: Backup stgpool fails

1999-06-16 12:27:07
Subject: Re: Backup stgpool fails
From: Don Caronna <dcaronna AT TTANK DOT COM>
Date: Wed, 16 Jun 1999 09:27:07 -0700
It's what you set the priority of your jobs at. Storage pool backups should be 
highest.
Don Caronna




Bob Brazner <Bob.Brazner AT JCI DOT COM> on 06/16/99 09:18:00 AM

Please respond to "ADSM: Dist Stor Manager" <ADSM-L AT VM.MARIST DOT EDU>



 To:      ADSM-L AT VM.MARIST DOT EDU

 cc:      (bcc: Don Caronna/Los Angeles/Ttank)



 Subject: Backup stgpool fails







We backup our tape pool daily (backup stgppool tapepool copypool).  We have 4
drives which are almost in the state of constant use with stgpool backups,
migrations and space reclamation.  If a customer starts a restore when all the
drives are in use, ADSM will cancel the stgpool backup in order to obtain the
needed drive.  This means we don't get a complete d/r set for that day.  Is
there a tweak that tells ADSM to cancel other stuff (e.g., space reclamation or
migrations) instead of stgpool backups?  Are there other methods to prevent
dynamic (i.e., customer-initiated) actions from interfering with planned
production operations?
----------------------------------
Thank You,
Thank You,

Don Caronna
Think Tank Systems, LLC
IBM CATE/ADSM Certified Technician/Solutions Provider
(562) 790-8925 x304
dcaronna AT ttank DOT com
www.ttank.com
<Prev in Thread] Current Thread [Next in Thread>