Is there a way in bconsole to run a job from a schedule?
Of course I could use the run command, and then modify all the
parameters. But what I'd like to be able to do is instead to pick a
schedule entry and have it run with all the values configured the way
the schedule would configure them.
There are several situations where I'd love to be able to do this.
First, it would allow testing the schedule. Second, if bacula decides to
upgrade the level from Incremental to Full, with the command line
version there is, to my knowledge, no way to have it automatically also
change the pool correspondingly.
--
Kevin Keane
Owner
The NetTech
Find the Uncommon: Expert Solutions for a Network You Never Have to Think About
Office: 866-642-7116
http://www.4nettech.com
This e-mail and attachments, if any, may contain confidential and/or
proprietary information. Please be advised that the unauthorized use or
disclosure of the information is strictly prohibited. The information herein is
intended only for use by the intended recipient(s) named above. If you have
received this transmission in error, please notify the sender immediately and
permanently delete the e-mail and any copies, printouts or attachments thereof.
------------------------------------------------------------------------------
Apps built with the Adobe(R) Flex(R) framework and Flex Builder(TM) are
powering Web 2.0 with engaging, cross-platform capabilities. Quickly and
easily build your RIAs with Flex Builder, the Eclipse(TM)based development
software that enables intelligent coding and step-through debugging.
Download the free 60 day trial. http://p.sf.net/sfu/www-adobe-com
_______________________________________________
Bacula-users mailing list
Bacula-users AT lists.sourceforge DOT net
https://lists.sourceforge.net/lists/listinfo/bacula-users
|