Re: dumpcycle
2008-09-23 17:07:08
On Tue, Sep 23, 2008 at 12:12:47PM -0700, aminukapon wrote:
> hello all,
>
> I need a brief clarification on what the dumpcycle is and how it involves
> incremental backup and full backups . Most of what I have read online have
> been confusing thus far.
>
Basically it is the time between level 0 backups.
For amanda, it is thought of as a "maximum time" between level 0's.
Think about a traditional backup scheme:
on Sunday night you do a full, level 0, backup of everything.
On Monday - Saturday you do incrementals. Your dumpcycle
in this case is 7 days, the time between level 0's. Always
and for everything.
Amanda does the same thing with a few caveats.
- The dumpcycle is applied to each DLE, some get their level 0
on Sundays, others on Monday, others Tues etc.
- Even for a single DLE, the day the level 0 is done can
vary. Amanda may decide to "promote" the level 0 for
some DLE and thus do it early. Why; several possibilities.
Maybe a lot of data changed and the incremental would be
close in size to a level 0. Amanda likes to dump the
same amount each run, maybe Tuesdays level 0's have gotten
too large (or small) and the order needs to be redone.
Maybe a client was done one night and threw the schedule off.
But again, basically dumpcycle is nominally the maximum time
between level 0 dumps of a DLE. You can set it globally and
on a DLE by DLE basis.
jl
--
Jon H. LaBadie jon AT jgcomp DOT com
JG Computing
12027 Creekbend Drive (703) 787-0884
Reston, VA 20194 (703) 787-0922 (fax)
|
|
|