ADSM-L

Losing schedule event

1998-01-29 09:21:42
Subject: Losing schedule event
From: Tom Brooks <tbrooks AT VNET.IBM DOT COM>
Date: Thu, 29 Jan 1998 06:21:42 PST
 This is normal behavior, here is why: When the event table is
updated the information needed to determine if a schedule has
been missed or needs to be run is taken from the schedule
table. We compare the startdate/starttime from what is
in the schedule table to what is in the event table. If the two
tables have different startdate/starttime, then the comparison would
be useless in determing if a schedule has been missed or not.
Consequently, event table records with old startdate/starttime are
removed.

Tom Brooks
ADSM Development
<Prev in Thread] Current Thread [Next in Thread>