Hello List, When I start a Copy type job, two jobs are actually started. E.g when I want to copy a job originally called 'client1-full' within a Copy job called 'client1-copy', the database holds two running job records, one of them called 'client1-copy', with the Type field set to 'C' (Copy), and the other called 'client1-full', level F, Type B (Backup). Is there a way to find out if this second one is started because of the Copy job, or it is meant to be run e.g because of a schedule or a console action?
Thanks in advance! Best regards, Gergely Polonkai -- "You need to believe in things that aren't true. How else can they become?" - Terry Pratchett
------------------------------------------------------------------------------
Xperia(TM) PLAY
It's a major breakthrough. An authentic gaming
smartphone on the nation's most reliable network.
And it wants your games.
http://p.sf.net/sfu/verizon-sfdev _______________________________________________
Bacula-users mailing list
Bacula-users AT lists.sourceforge DOT net
https://lists.sourceforge.net/lists/listinfo/bacula-users
|