On Tue, Feb 18, 2003 at 10:27:44AM +0100, rb AT raphinou DOT com wrote:
>
> I have indeed a tapecycle 4 configuration
> Is there a way to make sevral backup a day but still have the same
> behaviour as if those backups were made one per day? (without playing
> wit the date of the computer)
>
You can run several backups a day just fine. However
you must not use more tapes than your tapecycle is.
And to be careful and prepared for disaster:
Have always three generations handy.
I _recommend_ to have at least:
3 * runspercycle * runtapes Tapes.
man amanda says:
For instance, if dumpcycle is set to 14 days, one
Amanda run is done every day (Sunday through Satur
day), and runtapes is set to one, then tapecycle
must be at least 15 (14 days * one run/day * one
tape/run + one tape).
E.g. you are testing with dumpcycle 1 and up to 4 runs a day, you need
5 tapes as _absolute minimum_ (and then you are depending on each
tape!) and 12 for a warm and fuzzy feeling.
> I took a look at the mail I received, but it didn't mention anything
> wrong. See below for the whole mail.
Overflowing the tapecycle in just one day is apparently
not prohibited :-((
Ciao
Dietmar
--
Dietmar Goldbeck, Senior Consultant, <dietmar.goldbeck AT neteligent DOT de>
Neteligent GmbH, http://www.neteligent.de/
Walter-Benjamin-Platz 6, 10629 Berlin, Germany
fon: +49 (0)30/310182-73, fax: +49 (0)30/310182-79
|