Windows GPF during simultaneous execution of B/A client and Scheduler
1994-11-30 16:18:40
Subject: |
Windows GPF during simultaneous execution of B/A client and Scheduler |
From: |
"Amy Lim Weaver (408) 256-0284 t/l 276-0284" <alim AT VNET.IBM DOT COM> |
Date: |
Wed, 30 Nov 1994 13:18:40 PST |
With the latest level (V1 R2 Level 0.4) of the ADSM Windows Client,
simultaneous execution of the Scheduler and the Backup/Archive client
will cause a General Protection Fault (GPF).
Development is working on the problem, and will append once a fix
is available.
Thanks for your patience!
Amy Weaver
|
<Prev in Thread] |
Current Thread |
[Next in Thread> |
- Windows GPF during simultaneous execution of B/A client and Scheduler,
Amy Lim Weaver (408) 256-0284 t/l 276-0284 <=
|
|
|