Re: [Veritas-bu] Frequency Based Schedules
2009-06-03 18:10:06
It's a good thing I didn't take that
bet with Bob, though I'm quite sure that one of the guides stated that
retention level was the culprit. I went and looked at the 5.1 and 6.0 guides
and they are identical to what Darren stated.
After reading that email from the Symantec
guy, I'm more intrigued about all the different methods of choosing the
winner. Maybe the vapor-technote will lend credibility to my side of the
argument.
Anyway, thanks for setting me straight.
Rusty Major, MCSE, BCFP, VCS ▪
Sr. Storage Engineer ▪ SunGard Availability Services ▪ 757 N. Eldridge
Suite 200, Houston TX 77079 ▪ 281-584-4693
Keeping People and Information Connected®
▪ http://availability.sungard.com/
P
Think before you print
CONFIDENTIALITY: This e-mail (including
any attachments) may contain confidential, proprietary and privileged information,
and unauthorized disclosure or use is prohibited. If you received
this e-mail in error, please notify the sender and delete this e-mail from
your system.
A Darren Dunham <ddunham AT taos DOT com>
Sent by: veritas-bu-bounces AT mailman.eng.auburn DOT edu
06/03/2009 03:25 PM
|
To
| veritas-bu AT mailman.eng.auburn DOT edu
|
cc
|
|
Subject
| Re: [Veritas-bu] Frequency Based Schedules |
|
On Wed, Jun 03, 2009 at 12:02:22PM -0500, Rusty.Major AT sungard DOT com
wrote:
> >and the longest frequency will win--the monthly will run.
>
> Bob, that's what usually happens, but that's not why. The trump card
is
> the retention level, which usually is matched to a longer frequency,
but
> may not always be the case.
If that's true (and it wouldn't put it past them), it's a bug. The
Administrator's Guide is explicit that frequency is the winner here:
Backup frequency determines schedule priority
If more than one automatic schedule is due for a client within a policy,
the backup frequency determines the schedule that NetBackup uses:
* Jobs from the schedule with the lower frequency (longer period between
backups) always have higher priority. For example, a schedule with
a
backup frequency of one year has priority over a schedule with a
backup frequency of one month.
[...]
--
Darren
_______________________________________________
Veritas-bu maillist - Veritas-bu AT mailman.eng.auburn DOT edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
_______________________________________________
Veritas-bu maillist - Veritas-bu AT mailman.eng.auburn DOT edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
|
|
|