Yes, I had a similar problem with 5.1.

I use calendar schedules and "fulls" had been completed Saturday.  There 
were two types of NetBackup schedule failure that I found.

* Incrementals that finished during 1-2 am then ran a full (there was a 
catch-up window, but none should have run because they ran successfully 
the previous day).
* A number of my Oracle DB incrementals, all with a window later in the 
(DST ending) day, should have had a scheduled incremental, but none 
happened. 

Maybe NetBackup doesn't like 25 hour days. :-(

cheers, wayne


A Darren Dunham wrote, in part,  on 2007-11-05 8:16 PM:
> Anyone have any scheduler issues with NBU this weekend?
>
> My Linux 6.0MP4 master server had a hiccup.  Almost every policy I have
> is calendar based, with full backups scheduled for the last day of the
> month or the 15th of the month.
>
> This morning I came in and discovered that the backups that were started
> on Sunday the 4th included a great number of 'full' schedules.  This
> really ripped into the tape usage, and I have no idea why they got
> scheduled.  
>
> I wonder if some part of the scheduler was trying to cope with the local
> timezone change from daylight saving time that day....
>
>   
_______________________________________________
Veritas-bu maillist  -  Veritas-bu AT mailman.eng.auburn DOT edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

<Prev in Thread] Current Thread [Next in Thread>