You
need to set you max backup copies to 3 or higher under host properties ->
master server -> <hostname> -> properties -> global
attributes.
also,
if you want to create 2 copies, you can do that in the DSSU
properties.
right
click the STU, select "change" -> disk staging schedule -> check multiple
copies -> configure, set # of copies to "2", then configure the volume pool
and retention for each copy. you save a ton of time by writing both at once,
then you only need to use Vault to eject the offsite copy.
Paul
--
Greetings,
I believe i know
the answer, but i will see if more experienced people have delt with this
before.
I have a Netbackup
5.1 (MP5) environment, I have just added a new disk staging storage
unit for Database backups.
I need to get two
copies of these backups put onto tape, the first copy is easy as the DSSU
takes care of that ( with the retention specified in the policy ). I seed to
get a second copy made for offsite with a longer
retention.
I have set up a
Vault profile for these jobs however when it goes to duplicate the images it
failes with 190, the duplicate log says skipping ... it already has 2
copies.
Vault is counting
the copy on the disk, and the copy made by the dssu staging back to
tape.
Is this expected
behaviour or is there some way for Vault to "ignore?" the temporary copy on
disk. I imagine it is and my only option is to up the "maximum backup copies"
on the master.
anybody been down
this road before ?.
thanks. ====================================================================================
La version française suit le texte anglais.
------------------------------------------------------------------------------------
This email may contain privileged and/or confidential information, and the Bank of
Canada does not waive any related rights. Any distribution, use, or copying of this
email or the information it contains by other than the intended recipient is
unauthorized. If you received this email in error please delete it immediately from
your system and notify the sender promptly by email that you have done so.
------------------------------------------------------------------------------------
Le présent courriel peut contenir de l'information privilégiée ou confidentielle.
La Banque du Canada ne renonce pas aux droits qui s'y rapportent. Toute diffusion,
utilisation ou copie de ce courriel ou des renseignements qu'il contient par une
personne autre que le ou les destinataires désignés est interdite. Si vous recevez
ce courriel par erreur, veuillez le supprimer immédiatement et envoyer sans délai Ã
l'expéditeur un message électronique pour l'aviser que vous avez éliminé de votre
ordinateur toute copie du courriel reçu.
_______________________________________________
Veritas-bu maillist - Veritas-bu AT mailman.eng.auburn DOT edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
|