Veritas-bu

[Veritas-bu] New veritas installation - jobs do not start inparallel, all else queueing

2006-09-10 18:52:32
Subject: [Veritas-bu] New veritas installation - jobs do not start inparallel, all else queueing
From: jerry_vochteloo at symantec.com (Jerry Vochteloo)
Date: Mon, 11 Sep 2006 08:52:32 +1000
There are are multiple settings that control the number of jobs that run at the 
same time (a little annoying at first,
but great for flexibility in complex environments)
 
Multiplexing: need to set the max mpx in both the storage unit and the schedule
 
Multistreaming: need to set allow multiple datastreams in the policy attributes
 
and (the one I would bet you don't have set currently :)
 
Host properties-> master server -> global netbackup attributes -> max jobs per 
client (need to be set greater then one)
 
if you do all these and it still doesn't work (stop and restart nbu) and try 
again, if it still doesn't work check that
 
max jobs this client hasn't been set for that particular client.
 
hth
 
j
 

--
Jerry Vochteloo
w: +61-2-8220-7043, m: +61 408 206 748

The opinions stated here are mine and do not necessarily represent those of
Symantec Corp



 

  _____  

From: veritas-bu-bounces at mailman.eng.auburn.edu [mailto:veritas-bu-bounces 
at mailman.eng.auburn.edu] On Behalf Of Wessam
Aly
Sent: Saturday, 9 September 2006 10:18 PM
To: veritas-bu at mailman.eng.auburn.edu
Subject: [Veritas-bu] New veritas installation - jobs do not start inparallel, 
all else queueing



Hey all, 

I just started a new instakllation of Veritas Netbackup Entreprise 5.1 MP4. I 
have 2 LTO3 drives in an STK L500 library.

The 2-drive storage unit is configured for MPX 3 and with no max frag limit. 

Whenever I start a new job (configured for multiple streams), Always only one 
stream starts writing to one drive, the
the rest of jobs are idle. The other drive is sitting idle. The job is 
configured with 3 or more streams.

What could be the problem ? 

Thanks, 
Wessam Aly 
Senior UNIX & Storage Systems Admin. 



*******
IMPORTANT

Confidentiality: This e-mail communication and any attachments thereto contain 
information which is confidential and are
intended only for the use of the individuals or entities named above. If you 
are not the intended recipient, you are
hereby notified that any disclosure, copying, distribution or the taking any 
action in reliance on the contents of these
documents is strictly prohibited and may be illegal. Please notify us of your 
receipt of this e-mail in error and delete
the e-mail and any copies of it.

Monitoring/Viruses: Mobinil may monitor all incoming & outgoing e-mails in line 
with current legislation. Although we
have taken steps to ensure that this e-mail and attachments are free from any 
Virus, we advise that in keeping with good
computing practice the recipient should ensure they are actually virus free.

The Egyptian Company for Mobile Services (Mobinil) 
www.mobinil.com
*******

-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
http://mailman.eng.auburn.edu/pipermail/veritas-bu/attachments/20060911/51513b06/attachment.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: smime.p7s
Type: application/x-pkcs7-signature
Size: 4507 bytes
Desc: not available
Url : 
http://mailman.eng.auburn.edu/pipermail/veritas-bu/attachments/20060911/51513b06/smime.bin

<Prev in Thread] Current Thread [Next in Thread>
  • [Veritas-bu] New veritas installation - jobs do not start inparallel, all else queueing, Jerry Vochteloo <=