[Veritas-bu] dssu's and volume pool following...
2006-05-25 20:40:01
Subject: |
[Veritas-bu] dssu's and volume pool following... |
From: |
Tristan.Ball at vsl.com.au (Tristan Ball) |
Date: |
Fri, 26 May 2006 10:40:01 +1000 |
Netbackup Vault will do what you want - if you're up for spending the
cash! :-)
Alternatively, you can script something inhouse.
Regards,
T.
---
Tristan Ball
System Administrator
Vision Systems
+61-3-9211-7064
-----Original Message-----
From: veritas-bu-bounces at mailman.eng.auburn.edu
[mailto:veritas-bu-bounces at mailman.eng.auburn.edu] On Behalf Of Peter
DrakeUnderkoffler
Sent: Friday, 26 May 2006 12:26 AM
To: veritas-bu at mailman.eng.auburn.edu
Subject: [Veritas-bu] dssu's and volume pool following...
-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1
Anyone know if there is work in progress to have phase 2 of the disk
staging follow different volume pools if so desired? As it stands in
6.0MP2, all phase
2 destinations to tape go to the same volume pool. I have many policies
utilizing a storage unit group made of several dssus and it would be
nice to split out the volume pools. The only way around this right now
I know of is to have various dssus used for different policies and those
phase 2 schedules use whatever desired volume pool.
This would increase the number of needed dssus a little to far I think.
Thanks
Peter
- --
Peter DrakeUnderkoffler
Xinupro, LLC
617-834-2352
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.1 (FreeBSD)
iD8DBQFEdb5ll+lekZRM55oRAuicAJ4rUOMsoSevRyjYvVLwEXpdWQQ1RwCgsPAX
haBZkY+2wb7gB7yG3xx5PnE=
=3JWy
-----END PGP SIGNATURE-----
_______________________________________________
Veritas-bu maillist - Veritas-bu at mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
|
|
|