[Veritas-bu] Problems with calendar based schedules kicking off
2003-08-30 04:50:20
Subject: |
[Veritas-bu] Problems with calendar based schedules kicking off |
From: |
falconmfm2 AT yahoo DOT es (Miguel Angel) |
Date: |
Sat, 30 Aug 2003 10:50:20 +0200 |
Hi .
I have problem with Mensual full backup ... than's never start .. see my
politicy
vbkmaste#>bppllist FS_CLT_sha-ssgfwg_0 -U
------------------------------------------------------------
Policy Name: FS_CLT_sha-ssgfwg_0
Policy Type: Standard
Active: yes
Effective date: 12/26/2002 16:27:59
Client Compress: no
Follow NFS Mounts: no
Cross Mount Points: no
Collect TIR info: no
Block Incremental: no
Mult. Data Streams: no
Frozen Image: 0
Backup Copy: 0
Client Encrypt: no
Policy Priority: 30
Max Jobs/Policy: 99
Disaster Recovery: 0
Residence: SG-servicios-administradors
Volume Pool: R0_tde_SEM
Keyword: (none specified)
HW/OS/Client: Solaris Solaris8 shgticsaw01.adm
Solaris Solaris8 shgticnhm01.adm
HP9000-700 HP-UX11.00 shgticmlm01.adm
HP9000-700 HP-UX11.00 shgticmds01.adm
Include: ALL_LOCAL_DRIVES
Schedule: Total_Semanal
Type: Full Backup
Frequency: every 1 day
Maximum MPX: 5
Retention Level: 23 (6 weeks)
Number Copies: 1
Fail on Error: 0
Residence: (specific storage unit not required)
Volume Pool: (same as policy volume pool)
Daily Windows:
Sunday 21:00:00 --> Monday 08:00:00
Schedule: Incremental_Diario
Type: Differential Incremental Backup
Frequency: every 1 day
Maximum MPX: 5
Retention Level: 0 (1 week)
Number Copies: 1
Fail on Error: 0
Residence: (specific storage unit not required)
Volume Pool: (same as policy volume pool)
Daily Windows:
Monday 21:00:00 --> Tuesday 07:50:00
Tuesday 21:00:00 --> Wednesday 08:00:00
Wednesday 21:00:00 --> Thursday 08:00:00
Thursday 21:00:00 --> Friday 08:00:00
Friday 21:00:00 --> Saturday 08:00:00
Schedule: 77_Total_Mensual
Type: Full Backup
Maximum MPX: 5
Retention Level: 8 (1 year)
Number Copies: 1
Fail on Error: 0
Residence: (specific storage unit not required)
Volume Pool: (same as policy volume pool)
Calendar sched: Enabled
Sunday, Week 5
Daily Windows:
Sunday 21:00:00 --> Monday 08:00:00
Monday 21:00:00 --> Tuesday 08:00:00
Tuesday 21:00:00 --> Wednesday 08:00:00
Wednesday 21:00:00 --> Thursday 08:00:00
Thursday 21:00:00 --> Friday 08:00:00
Friday 21:00:00 --> Saturday 08:00:00
Saturday 21:00:00 --> Sunday 08:00:00
----- Original Message -----
From: "Johnny Oestergaard" <joe AT joe DOT net>
To: "Dwayne Adams" <dwadams AT macromedia DOT com>;
<Veritas-bu AT mailman.eng.auburn DOT edu>
Sent: Friday, August 29, 2003 9:44 PM
Subject: Re: [Veritas-bu] Problems with calendar based schedules kicking off
> I think that everybody who has tried the calender based schedules have had
> problems.
> Let us hope it works better in the next version of NBU
>
> /johnny
>
> At 12:16 29-08-2003 -0700, Dwayne Adams wrote:
> >Hello,
> >
> >
> >
> >Has anyone ever had any problems with calendar based daily incremental
> >backups not kicking off at the scheduled time? Also, backups completed
the
> >night before.
> >
> >
> >
> >Thanks in advance for any help.
> >
> >
> >
> >Dwayne Adams
> >_______________________________________________
> >Veritas-bu maillist - Veritas-bu AT mailman.eng.auburn DOT edu
> >http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
>
> _______________________________________________
> Veritas-bu maillist - Veritas-bu AT mailman.eng.auburn DOT edu
> http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
|
|
|