Quoting "Donaldson, Mark" <Mark.Donaldson AT experianems DOT com>:
> An option would be to replace the bpbackup with bpsched with the (IB) flag
> (background it or it'll run in the foreground). This would put the
> scheduler in charge of it.
>
> A lot of manual things (bpduplicate, bpbackups) don't seem to run as well
> as
> things managed by the scheduler.
Hmm. I thought this would be the solution, but we have a multiple-master
environment, and I have this script working on our reporting master, and it
sends the requests to each datacenter's master. With bpsched, I can't do that,
since each datacenter handles its own scheduling. i.e. with bpbackup, I can use
the "-M" to tell it to run the backup on machine X. Not, at least, unless
bpsched has another hidden option like so many of the Netbackup commands. ;)
--
Scott Garrett mailto:sgarrett AT technomancer DOT com
http://www.technomancer.com
*** No matter what you do, you'll never outsmart the squirrels.
|