Veritas-bu

[Veritas-bu] how to do full backup without changing the achi eve b it ?

2000-12-20 10:41:02
Subject: [Veritas-bu] how to do full backup without changing the achi eve b it ?
From: Richard, Alain alain.richard AT menv.gouv.qc DOT ca
Date: Wed, 20 Dec 2000 10:41:02 -0500
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C06A9B.42357A50
Content-Type: text/plain;
        charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

No,

It is not a question of creating a new class for that full backup but =
to do
a full backup and not touch the achive bit, becose the next day the =
r=E9gular
scedule gone a run a incremental differentiel.=20

I want the  incremental differentiel to be from the last regular =
scedule
full backup and not from my special end of year backup.

Alain

-----Message d'origine-----
De: Rob Worman [mailto:rob AT colltech DOT com]
Date: 20 d=E9cembre, 2000 10:45
=C0: Richard, Alain
Cc: veritas-bu AT mailman.eng.auburn DOT edu
Objet: Re: [Veritas-bu] how to do full backup without changing the
achieve b it ?


So your boxes might all be scheduled for their normal full backups on
January 2nd, and you want to run a full backup on December 31st that =
will
not change the scheduling of that January 2nd backup?

I'd suggest you create a new class for this purpose.  (Netbackup full =
and
incremental comparisons for a particular client are tied to the =
classname)

HTH
rob

I everyone,

I have to do a full backup at the end of the year. But i don't want to
affect the regular backup. Is this a command or a command line in =
netbackup
3.4 to do a full backup of all my server and didn't change the achive =
bit?

Someome have an idee, (duplicate is not an option).


Alain Richard
Minist=E8re de l'Environnement
=C9difice Marie-Guyart
675, Bd Ren=E9-L=E9vesque Est, 2e =E9tage
Qu=E9bec  (Qu=E9bec)
G1R 5V7

T=E9l.:          (418) 521-3838  #4733
Fax :         (418) 643-8999
Internet :   Alain.Richard AT mef.gouv.qc DOT ca

------_=_NextPart_001_01C06A9B.42357A50
Content-Type: text/html;
        charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Diso-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2650.12">
<TITLE>RE: [Veritas-bu]  how to do full backup without changing the =
achieve b       it ?</TITLE>
</HEAD>
<BODY>

<P><FONT SIZE=3D2>No,</FONT>
</P>

<P><FONT SIZE=3D2>It is not a question of creating a new class for that =
full backup but to do a full backup and not touch the achive bit, =
becose the next day the r=E9gular scedule gone a run a incremental =
differentiel. </FONT></P>

<P><FONT SIZE=3D2>I want the&nbsp; incremental differentiel to be from =
the last regular scedule full backup and not from my special end of =
year backup.</FONT></P>

<P><FONT SIZE=3D2>Alain</FONT>
</P>

<P><FONT SIZE=3D2>-----Message d'origine-----</FONT>
<BR><FONT SIZE=3D2>De: Rob Worman [<A =
HREF=3D"mailto:rob AT colltech DOT com">mailto:rob AT colltech DOT 
com</A>]</FONT>
<BR><FONT SIZE=3D2>Date: 20 d=E9cembre, 2000 10:45</FONT>
<BR><FONT SIZE=3D2>=C0: Richard, Alain</FONT>
<BR><FONT SIZE=3D2>Cc: veritas-bu AT mailman.eng.auburn DOT edu</FONT>
<BR><FONT SIZE=3D2>Objet: Re: [Veritas-bu] how to do full backup =
without changing the</FONT>
<BR><FONT SIZE=3D2>achieve b it ?</FONT>
</P>
<BR>

<P><FONT SIZE=3D2>So your boxes might all be scheduled for their normal =
full backups on January 2nd, and you want to run a full backup on =
December 31st that will not change the scheduling of that January 2nd =
backup?</FONT></P>

<P><FONT SIZE=3D2>I'd suggest you create a new class for this =
purpose.&nbsp; (Netbackup full and incremental comparisons for a =
particular client are tied to the classname)</FONT></P>

<P><FONT SIZE=3D2>HTH</FONT>
<BR><FONT SIZE=3D2>rob</FONT>
</P>

<P><FONT SIZE=3D2>I everyone,</FONT>
</P>

<P><FONT SIZE=3D2>I have to do a full backup at the end of the year. =
But i don't want to affect the regular backup. Is this a command or a =
command line in netbackup 3.4 to do a full backup of all my server and =
didn't change the achive bit?</FONT></P>

<P><FONT SIZE=3D2>Someome have an idee, (duplicate is not an =
option).</FONT>
</P>
<BR>

<P><FONT SIZE=3D2>Alain Richard</FONT>
<BR><FONT SIZE=3D2>Minist=E8re de l'Environnement</FONT>
<BR><FONT SIZE=3D2>=C9difice Marie-Guyart</FONT>
<BR><FONT SIZE=3D2>675, Bd Ren=E9-L=E9vesque Est, 2e =E9tage</FONT>
<BR><FONT SIZE=3D2>Qu=E9bec&nbsp; (Qu=E9bec)</FONT>
<BR><FONT SIZE=3D2>G1R 5V7</FONT>
</P>

<P><FONT =
SIZE=3D2>T=E9l.:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =
(418) 521-3838&nbsp; #4733</FONT>
<BR><FONT SIZE=3D2>Fax =
:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (418) 643-8999</FONT>
<BR><FONT SIZE=3D2>Internet :&nbsp;&nbsp; =
Alain.Richard AT mef.gouv.qc DOT ca</FONT>
</P>

</BODY>
</HTML>
------_=_NextPart_001_01C06A9B.42357A50--



<Prev in Thread] Current Thread [Next in Thread>
  • [Veritas-bu] how to do full backup without changing the achi eve b it ?, Richard , Alain alain . richard <=