Veritas-bu

[Veritas-bu] Keeping jobs in the queue from becoming active

2000-12-19 14:18:38
Subject: [Veritas-bu] Keeping jobs in the queue from becoming active
From: Gregory McAllister gmcallis AT nortelnetworks DOT com
Date: Tue, 19 Dec 2000 14:18:38 -0500
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C069F0.7D467190
Content-Type: text/plain;
        charset="iso-8859-1"

try .... 'bprdreq -terminate'

Greg McAllister

-----Original Message-----
From: Dennis Dwyer [mailto:dfdwyer AT tecoenergy DOT com]
Sent: Tuesday, December 19, 2000 1:44 PM
To: John_Wang; miriam
Cc: veritas-bu
Subject: Re: [Veritas-bu] Keeping jobs in the queue from becoming active


What happens to backup jobs that may be running when you terminate the
request daemon? I have a situation coming up where at a certain point I may
not want any new jobs to start but I want those that are running to finish.
I suspect that I should be able to use this technique as well but I thought
I'd check.

Regards,


Dennis F. Dwyer
Enterprise Storage Manager
Tampa Electric Company

(813) 225-5181  - Voice
(813) 275-3599  - FAX

Visit our corporate website at www.tecoenergy.com

>>> Miriam Ben-Haim <miriam AT techunix.technion.ac DOT il> 12/19/00 02:18AM >>>

Hi,

I am sorry about the delay - I don't always find the time to read the
mails of this list.

The way I delt with this same issue was by stopping the bprd daemon - I
do it via the GUI (Terminate Request Daemon) and restarting it when I'm
done with whatever maintenance I did.

On Wed, 1 Nov 2000 John_Wang AT enron DOT net wrote:

>Hello
>
>I didn't get any replies last time I asked this so I thought I might
rephrase
>it.   I'd like to be able to cause jobs to not become active but still be
>queued.   The idea being that I can put a hold while I do some maintenance
or
>wait for whatever is still active to finish so that I can then do some
>maintenance and still have everything in the queue ready to run when I turn
it
>back over to production.
>
>So far, the only thing I can think of is to deactivate all the pertinent
classes
>and reactivate them after I'm done with maintenance but I don't know if
that
>will keep user directed backups in the queue.
>
>This is important because we've already had situations where during
maintenance,
>people have took it upon themselves to rearrange the tapes in the library
for
>esthetics sake.   Although the tape library does rescan the barcodes when
the
>door is closed, the Netbackup media database is not automatically
synchronized
>with the tape library's own database.   If new tapes have been added in
slots
>where Netbackup thinks another tape should be, the new tape will get the
wrong
>label and some images intended for another tape before the databases are
>synchronized resulting in a frozen tape after the next synchronization.
>Although this tends to happen when I'm out of town, I'd like to be able to
>insist on a procedure that prevents jobs from being active till the
databases
>are synchronized.
>
>Regards,
>John I Wang
>Sr. Systems Engineer
>Steverson Information Professionals
>
>---
>Enron Broadband Services
>Enron Building 1472c
>ph (713) 345-4291
>fax (713) 646-8063
>
>
>_______________________________________________
>Veritas-bu maillist  -  Veritas-bu AT mailman.eng.auburn DOT edu 
>http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu 
>


        Miriam


~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 Miriam Ben-Haim                 E-mail: miriam AT technion.ac DOT il 
 Unix Systems                    Phone : +972-4-8292177         
 Taub Computer Center            Fax   : +972-4-8236212          
 Technion - Israel Institute of Technology, Haifa 32000, ISRAEL  
                                                                         
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

_______________________________________________
Veritas-bu maillist  -  Veritas-bu AT mailman.eng.auburn DOT edu 
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

_______________________________________________
Veritas-bu maillist  -  Veritas-bu AT mailman.eng.auburn DOT edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu

------_=_NextPart_001_01C069F0.7D467190
Content-Type: text/html;
        charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Diso-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2652.35">
<TITLE>RE: [Veritas-bu] Keeping jobs in the queue from becoming =
active</TITLE>
</HEAD>
<BODY>

<P><FONT SIZE=3D2>try .... 'bprdreq -terminate'</FONT>
</P>

<P><FONT SIZE=3D2>Greg McAllister</FONT>
</P>

<P><FONT SIZE=3D2>-----Original Message-----</FONT>
<BR><FONT SIZE=3D2>From: Dennis Dwyer [<A =
HREF=3D"mailto:dfdwyer AT tecoenergy DOT com">mailto:dfdwyer AT tecoenergy DOT 
com</A>=
]</FONT>
<BR><FONT SIZE=3D2>Sent: Tuesday, December 19, 2000 1:44 PM</FONT>
<BR><FONT SIZE=3D2>To: John_Wang; miriam</FONT>
<BR><FONT SIZE=3D2>Cc: veritas-bu</FONT>
<BR><FONT SIZE=3D2>Subject: Re: [Veritas-bu] Keeping jobs in the queue =
from becoming active</FONT>
</P>
<BR>

<P><FONT SIZE=3D2>What happens to backup jobs that may be running when =
you terminate the request daemon? I have a situation coming up where at =
a certain point I may not want any new jobs to start but I want those =
that are running to finish. I suspect that I should be able to use this =
technique as well but I thought I'd check.</FONT></P>

<P><FONT SIZE=3D2>Regards,</FONT>
</P>
<BR>

<P><FONT SIZE=3D2>Dennis F. Dwyer</FONT>
<BR><FONT SIZE=3D2>Enterprise Storage Manager</FONT>
<BR><FONT SIZE=3D2>Tampa Electric Company</FONT>
</P>

<P><FONT SIZE=3D2>(813) 225-5181&nbsp; - Voice</FONT>
<BR><FONT SIZE=3D2>(813) 275-3599&nbsp; - FAX</FONT>
</P>

<P><FONT SIZE=3D2>Visit our corporate website at =
www.tecoenergy.com</FONT>
</P>

<P><FONT SIZE=3D2>&gt;&gt;&gt; Miriam Ben-Haim =
&lt;miriam AT techunix.technion.ac DOT il&gt; 12/19/00 02:18AM =
&gt;&gt;&gt;</FONT>
</P>

<P><FONT SIZE=3D2>Hi,</FONT>
</P>

<P><FONT SIZE=3D2>I am sorry about the delay - I don't always find the =
time to read the</FONT>
<BR><FONT SIZE=3D2>mails of this list.</FONT>
</P>

<P><FONT SIZE=3D2>The way I delt with this same issue was by stopping =
the bprd daemon - I</FONT>
<BR><FONT SIZE=3D2>do it via the GUI (Terminate Request Daemon) and =
restarting it when I'm</FONT>
<BR><FONT SIZE=3D2>done with whatever maintenance I did.</FONT>
</P>

<P><FONT SIZE=3D2>On Wed, 1 Nov 2000 John_Wang AT enron DOT net wrote:</FONT>
</P>

<P><FONT SIZE=3D2>&gt;Hello</FONT>
<BR><FONT SIZE=3D2>&gt;</FONT>
<BR><FONT SIZE=3D2>&gt;I didn't get any replies last time I asked this =
so I thought I might rephrase</FONT>
<BR><FONT SIZE=3D2>&gt;it.&nbsp;&nbsp; I'd like to be able to cause =
jobs to not become active but still be</FONT>
<BR><FONT SIZE=3D2>&gt;queued.&nbsp;&nbsp; The idea being that I can =
put a hold while I do some maintenance or</FONT>
<BR><FONT SIZE=3D2>&gt;wait for whatever is still active to finish so =
that I can then do some</FONT>
<BR><FONT SIZE=3D2>&gt;maintenance and still have everything in the =
queue ready to run when I turn it</FONT>
<BR><FONT SIZE=3D2>&gt;back over to production.</FONT>
<BR><FONT SIZE=3D2>&gt;</FONT>
<BR><FONT SIZE=3D2>&gt;So far, the only thing I can think of is to =
deactivate all the pertinent classes</FONT>
<BR><FONT SIZE=3D2>&gt;and reactivate them after I'm done with =
maintenance but I don't know if that</FONT>
<BR><FONT SIZE=3D2>&gt;will keep user directed backups in the =
queue.</FONT>
<BR><FONT SIZE=3D2>&gt;</FONT>
<BR><FONT SIZE=3D2>&gt;This is important because we've already had =
situations where during maintenance,</FONT>
<BR><FONT SIZE=3D2>&gt;people have took it upon themselves to rearrange =
the tapes in the library for</FONT>
<BR><FONT SIZE=3D2>&gt;esthetics sake.&nbsp;&nbsp; Although the tape =
library does rescan the barcodes when the</FONT>
<BR><FONT SIZE=3D2>&gt;door is closed, the Netbackup media database is =
not automatically synchronized</FONT>
<BR><FONT SIZE=3D2>&gt;with the tape library's own =
database.&nbsp;&nbsp; If new tapes have been added in slots</FONT>
<BR><FONT SIZE=3D2>&gt;where Netbackup thinks another tape should be, =
the new tape will get the wrong</FONT>
<BR><FONT SIZE=3D2>&gt;label and some images intended for another tape =
before the databases are</FONT>
<BR><FONT SIZE=3D2>&gt;synchronized resulting in a frozen tape after =
the next synchronization.</FONT>
<BR><FONT SIZE=3D2>&gt;Although this tends to happen when I'm out of =
town, I'd like to be able to</FONT>
<BR><FONT SIZE=3D2>&gt;insist on a procedure that prevents jobs from =
being active till the databases</FONT>
<BR><FONT SIZE=3D2>&gt;are synchronized.</FONT>
<BR><FONT SIZE=3D2>&gt;</FONT>
<BR><FONT SIZE=3D2>&gt;Regards,</FONT>
<BR><FONT SIZE=3D2>&gt;John I Wang</FONT>
<BR><FONT SIZE=3D2>&gt;Sr. Systems Engineer</FONT>
<BR><FONT SIZE=3D2>&gt;Steverson Information Professionals</FONT>
<BR><FONT SIZE=3D2>&gt;</FONT>
<BR><FONT SIZE=3D2>&gt;---</FONT>
<BR><FONT SIZE=3D2>&gt;Enron Broadband Services</FONT>
<BR><FONT SIZE=3D2>&gt;Enron Building 1472c</FONT>
<BR><FONT SIZE=3D2>&gt;ph (713) 345-4291</FONT>
<BR><FONT SIZE=3D2>&gt;fax (713) 646-8063</FONT>
<BR><FONT SIZE=3D2>&gt;</FONT>
<BR><FONT SIZE=3D2>&gt;</FONT>
<BR><FONT =
SIZE=3D2>&gt;_______________________________________________</FONT>
<BR><FONT SIZE=3D2>&gt;Veritas-bu maillist&nbsp; -&nbsp; =
Veritas-bu AT mailman.eng.auburn DOT edu </FONT>
<BR><FONT SIZE=3D2>&gt;<A =
HREF=3D"http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu"; =
TARGET=3D"_blank">http://mailman.eng.auburn.edu/mailman/listinfo/veritas=
-bu</A> </FONT>
<BR><FONT SIZE=3D2>&gt;</FONT>
</P>
<BR>

<P>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <FONT =
SIZE=3D2>Miriam</FONT>
</P>
<BR>

<P><FONT =
SIZE=3D2>~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~=
~~~~~</FONT>
<BR><FONT SIZE=3D2>&nbsp;Miriam =
Ben-Haim&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; E-mail: miriam AT technion.ac DOT il </FONT>
<BR><FONT SIZE=3D2>&nbsp;Unix =
Systems&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp=
;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Phone : =
+972-4-8292177 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </FONT>
<BR><FONT SIZE=3D2>&nbsp;Taub Computer =
Center&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;=
 Fax&nbsp;&nbsp; : +972-4-8236212 =
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </FONT>
<BR><FONT SIZE=3D2>&nbsp;Technion - Israel Institute of Technology, =
Haifa 32000, ISRAEL&nbsp; </FONT>
<BR>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<FONT SIZE=3D2> </FONT>
<BR><FONT =
SIZE=3D2>~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~=
~~~~~</FONT>
</P>

<P><FONT =
SIZE=3D2>_______________________________________________</FONT>
<BR><FONT SIZE=3D2>Veritas-bu maillist&nbsp; -&nbsp; =
Veritas-bu AT mailman.eng.auburn DOT edu </FONT>
<BR><FONT SIZE=3D2><A =
HREF=3D"http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu"; =
TARGET=3D"_blank">http://mailman.eng.auburn.edu/mailman/listinfo/veritas=
-bu</A></FONT>
</P>

<P><FONT =
SIZE=3D2>_______________________________________________</FONT>
<BR><FONT SIZE=3D2>Veritas-bu maillist&nbsp; -&nbsp; =
Veritas-bu AT mailman.eng.auburn DOT edu</FONT>
<BR><FONT SIZE=3D2><A =
HREF=3D"http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu"; =
TARGET=3D"_blank">http://mailman.eng.auburn.edu/mailman/listinfo/veritas=
-bu</A></FONT>
</P>

</BODY>
</HTML>
------_=_NextPart_001_01C069F0.7D467190--



<Prev in Thread] Current Thread [Next in Thread>