[Veritas-bu] Preemptive scheduling
2000-10-17 15:42:37
On Tue, 17 Oct 2000, McMurphy, Tim wrote:
Tim>If your full backups are taking more than 24 hours its time to get more and
Tim>faster hardware (ie network, tape drives, slaves etc). Management loves to
Tim>hear that :)
This is frequently one of the arguments, I come across. I'm in a
situation exactly as the original poster of this message. My full backups
run for too long and my incrementals start while full bkups still in
progress. I have a STK-9710 silo, and E-4500s as the backup servers and
backing up 300 machines (all servers) with data equalling 4-5 TB. My
network setup ain't bad. I would be hard pressed to believe that I need
more (OK my be Gigabit Ethernet, or trunking).
For the record, I activated MPX too. Still, I haven't gotten a
satisfactory level of performance. I have to try other options
like run Sun's SRM type stuff and figure out. My argument is, just
adding "better" hardware is never a full solution, at best partial.
-ravi
|
<Prev in Thread] |
Current Thread |
[Next in Thread>
|
- [Veritas-bu] Preemptive scheduling, John_Wang
- [Veritas-bu] Preemptive scheduling, Joshua Fielden jfielden
- [Veritas-bu] Preemptive scheduling, Jonathan Meyer jmeyer
- [Veritas-bu] Preemptive scheduling, McMurphy , Tim Tim . McMurphy
- [Veritas-bu] Preemptive scheduling, Joshua Fielden jfielden
- [Veritas-bu] Preemptive scheduling,
Ravi Channavajhala ravi . channavajhala <=
- [Veritas-bu] Preemptive scheduling, McMurphy , Tim Tim . McMurphy
- [Veritas-bu] Preemptive scheduling, Joshua Fielden jfielden
- [Veritas-bu] Preemptive scheduling, Richard C Bond rbond
- [Veritas-bu] Preemptive scheduling, Chandra Kalle ckalle
- [Veritas-bu] Preemptive scheduling, Joshua Fielden jfielden
- [Veritas-bu] Preemptive scheduling, Rob Worman rob
- [Veritas-bu] Preemptive scheduling, Patrick Boyle PBoyle
- [Veritas-bu] Preemptive scheduling, McMurphy , Tim Tim . McMurphy
|
|
|