Hi,
sometimes when the full backup over the
weekend has failed, I change the schedule on Monday to re-create the full
backup.
The problem is, that I only have one
volume in the full backup pool and a volume retention of six days. So every
time I change the schedule, I need to keep in mind, to remove the full backups
on Friday, before the “normal” full backup starts, because of the
retention period.
Is there a way to mark a volume as over
writable that I do not need to take care of that?
Thanks in advance!
Kind Regards,
Andreas