> > Correct me if I am wrong. It seems that when a DLE is set to
> > incremental backup, Amanda will try to get the size using various
>
> How did you specify "incremental backup"?
> There are several methods which have an influence:
>
> skip-full yes # when planner scheduled a lvl 0 skip it
> strategy nofull # only level 1 during planning/estimate
> strategy incronly # similar to skip-full but allows full
> # dumps with "amadmin force"
Hrom my config it is nothing of the above, the dumptype just mention
nothing.
> > methods:
> >
> > - full backup size
> > - same incremental level as the last one size
> > - next incremental level size
> >
> > I see in /tmp/amanda/sendsize... the following lines:
> >
> > sendsize[78984]: time 27.295: getting size via gnutar for /home/fidji level > > 0
> > sendsize[78984]: time 36.611: getting size via gnutar for /home/fidji level
> > 3
> > sendsize[78984]: time 38.428: getting size via gnutar for /home/fidji level
> > 4
> >
> > and it happens that the last incremental backup for /home/fidji was
> > level 3.
> >
> > Then Amanda would choose what level to use (0, 3 or 4).
>
> I guess that from the above lines you have "skip-full" and not
> "strategy incronly".
Neither, I have no strategy, nor skip anything.
> > Do I understand well?
> >
> > My problem is the following. I need to backup a Zope
> > installation. Zope keeps all the data in one single BIG file (it
> > quickly grows GBs). Amanda cannot do proper backup on the fly so I
> > need to either:
> >
> > - stop zope during the backup. Easy using a gnutar wrapper, but that
> > would put my web site away for some time.
> >
> > - use a tool provided by zope to make a safe copy of that big data
> > file and backup that copy.
> >
> > That tool allows incremental copies. How nice, I could match the
> > full copy with Amanda full backup and incremental copies with Amanda
> > incremental copies... But to get the size right, I need to make the
> > copy at the size estimate stage, not at the dump stage. And the size
> > estimate of Amanda always proceed to do a full estimate, so I would
> > end up anyway using Zope tool to do a full copy.
> >
> > If I do the copy at dump type only, the size estimate will be all
> > wrong (eventually by a large amount). How much can that affect
> > Amanda?
> If I understand your problem is that doing an estimate for lvl 0, N, N+1
> takes too long, especially the lvl 0.
Problem is not the time, but more of strategy:
It seems that there is an estimate full run every day, even if the
dump ends up being incremental.
If I do my full copy just before the full estimate, I will end up
doing a full copy every day, that defeates the purpose of having
incremental copy.
I will look at estimate server then.
best regards,