Re: multiple reclaim processes
2002-09-04 11:31:36
Two quick (and probably obvious) points:
- You can do multiple simultaneous reclamations if you have multiple
storage pools. Long on tape drives? Create another domain (& storage
pool(s)) and split your nodes between them.
- MOVE DATA (tape to tape, or tape back to disk) allows multiple
simultaneous processes on one storage pool and each is often faster than
the corresponding reclamation. The down-side to MOVE DATA is that
aggregates are not reconstructed, so your newly filled tape will
immediately have reclaimable space. Perhaps a statistician could tell
us the expected wasted space remaining after a MOVE DATA. Maybe with
too many caveats to be useful, ... but when I switched from exclusively
performing MOVE DATAs to exclusively performing reclamation, I "gained"
almost 20% empty volumes.
cheers, wayne
Wayne T. Smith, ADSM AT Maine DOT edu, University of Maine System
|
<Prev in Thread] |
Current Thread |
[Next in Thread>
|
- multiple reclaim processes, Levinson, Donald A.
- Re: multiple reclaim processes, Malbrough, Demetrius
- Re: multiple reclaim processes, bbullock
- Re: multiple reclaim processes,
Wayne T. Smith <=
- Re: multiple reclaim processes, Seay, Paul
- FW: multiple reclaim processes, Prather, Wanda
- Re: multiple reclaim processes, Seay, Paul
|
|
|