Re: Backup stgpool fails
1999-06-16 13:20:42
For that reason whe have 5 drives so 1 drive will always be availeble for
restore.
Ronald Bazuin
> ----------
> From: Bob Brazner[SMTP:Bob.Brazner AT JCI DOT COM]
> Reply To: ADSM: Dist Stor Manager
> Sent: woensdag 16 juni 1999 18:18
> To: ADSM-L AT VM.MARIST DOT EDU
> Subject: Backup stgpool fails
>
> We backup our tape pool daily (backup stgppool tapepool copypool). We
> have 4
> drives which are almost in the state of constant use with stgpool backups,
> migrations and space reclamation. If a customer starts a restore when all
> the
> drives are in use, ADSM will cancel the stgpool backup in order to obtain
> the
> needed drive. This means we don't get a complete d/r set for that day.
> Is
> there a tweak that tells ADSM to cancel other stuff (e.g., space
> reclamation or
> migrations) instead of stgpool backups? Are there other methods to
> prevent
> dynamic (i.e., customer-initiated) actions from interfering with planned
> production operations?
>
|
|
|