ADSM-L

Simple concept Question

1999-02-12 09:22:30
Subject: Simple concept Question
From: Dominic Talbot <dotalbo AT IBM DOT NET>
Date: Fri, 12 Feb 1999 16:22:30 +0200
Hello Adsmers,
Just a quick question on reclamation. Is a volume eligible for reclamation
only when it is full. If not what is the reclamation percentage determined
against; The estimated capacity of the tape volume, or the percentage
utilized of the estimated capacity. An example extracted from a "q vol *
f=d"

Volume Name: 156KJZ
Stg: Backuppool
Devc: Adsmdev
Estimated Capacity (MB): 5000
Pct Util: 48.9
Vol Status: Filling
Access: Read/Write
Pct. Reclaimable Space: 7.8

How is reclamation determined when I send a partly used volume offsite?

Regards
Dominic Talbot
<Prev in Thread] Current Thread [Next in Thread>