Re: [Fwd: Problems with Schedule !!!]
1998-12-04 15:16:29
Subject: |
Re: [Fwd: Problems with Schedule !!!] |
From: |
"Eggert, Randall" <REggert AT WIS.TWC DOT COM> |
Date: |
Fri, 4 Dec 1998 14:16:29 -0600 |
Leandro,
The randomization you speak of is an ADSM feature, to quote:
"To randomize start times for schedules means to scatter each
schedule's start time across its startup window. A startup window
is
the start time and duration during which a schedule must be
initiated."
This supposedly reduces the network and server being hit at once with all
the clients defined to a single schedule starting simultaneously.
You can control randomization by specifying a percentage between zero(0), no
randomization, and 50%. This is controlled by issuing a "set randomize nn"
command to your server. This will affect ALL schedules.
Hope this helps
Randy
|
|
|