ADSM-L

Schedule not working

1998-10-07 12:45:41
Subject: Schedule not working
From: David Crossley <dcrossley AT IMAIL.CITY.VANCOUVER.BC DOT CA>
Date: Wed, 7 Oct 1998 09:45:41 -0700
I have a newbie question.  I am not our ADSM administrator, however, I
find myself
having to learn a lot about it.  I am a BASIS/AIX/DB2 administrator
interfacing with
ADSM for our filesystem, archive and database backups.  I am having some
problems getting
the backups to work via the schedule for some of our servers.  I can
successfully run backups to ADSM via
interactive methods (db2 R3 admin utilities, ADSM client filesystem
backups using dsm, and log archiving to
ADSM). However, when I use the client schedule, I get the following
error message in the activity log:

Filesystem backup:

10/06/98 21:00:01     tNR2578I Schedule DAILY_PROD in domain SAP for
node
                       COVPRD has missed its scheduled start up window.
10/06/98 21:00:01     ANR2578I Schedule DAILY_AP3 in domain SAP for node
COVAP3
                       has missed its scheduled start up window.
10/06/98 21:00:01     ANR2578I Schedule DAILY_AP4 in domain SAP for node
COVAP4
                       has missed its schoduled start up window.

DB2 backup:

10/06/98 00:40:01     ANR2578I Schedule PRD_SAP in domain SAP for node
COVPRD
                       has missed its scheduled start up window.

Any ideas as to what is wrong ?  I have scheduled a number of backups at
similar start times (15 minute
gaps) so I am not sure whether the ADSM server is experiencing a
randomizing error.

Here is the schedule information for some of these schedules:

SAP            DAILY_AP1        Inc Bk 06/30/1998 17:50:00      5 M    1
D  Any   *** Not working
SAP            DAILY_AP2        Inc Bk 06/30/1998 19:30:00      5 M    1
D  Any    *** Not working
SAP            DAILY_AP3        Inc Bk 06/30/1998 20:00:00      1 H    1
D  Any     *** Not working
SAP            DAILY_AP4        Inc Bk 06/30/1998 20:00:00      1 H    1
D  Any     *** Not working
SAP            DAILY_DEV        Inc Bk 06/30/1998 21:00:00      1 H    1
D  Any    *** Working
SAP            DAILY_PROD       Inc Bk 06/30/1998 20:00:00      1 H    1
D  Any    *** Not working
SAP            DAILY_QAS        Inc Bk 06/30/1998 22:00:00      1 H    1
D  Any    *** Working
SAP            DAILY_SBX        Inc Bk 06/30/1998 20:00:00      1 H    1
D  Any    *** Working
SAP            DEV_LOG          CMD    07/02/1998 18:00:00      5 M    1
D  Any   *** Working
SAP            DEV_SAP          CMD    08/01/1998 00:10:00     25 M    1
D  Any   *** Working
SAP            PRD_SAP          CMD    09/30/1998 00:15:00     25 M    1
D  Any     *** Not working


I created the PRD and AP1-AP4 schedules by copying existing and working
schedules
from DEV and QAS.  Also, is there a way to obtain more error message
information online
for the above errors (ANR2578I).  Thanks for any assistance.

David
--
David Crossley, Senior Technical Support Specialist
David Crossley, Senior Technical Support Specialist
E-mail: david_crossley AT city.vancouver.bc DOT ca (MS-MAIL)
        dcrossley AT imail.city.vancouver.bc DOT ca (POP)
VOICE: 604.871.6557 (w) 604.521.2068 (h) FAX: 604.871-6534 PAGER:
604.641.5082
URL: http://www.city.vancouver.bc.ca/
<Prev in Thread] Current Thread [Next in Thread>