Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[Veritas\-bu\]\s+whats\s+wrong\s+with\s+my\s+calendar\s+based\s+backupschedule\.bppllist\s+included\.\s*$/: 6 ]

Total 6 documents matching your query.

1. [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included. (score: 1)
Author: stumpb at michigan.gov (Bob Stump)
Date: Tue, 13 Jun 2006 12:21:26 -0400
goofy isn't the word I was thinking of....bad prcatice to do backups from 6PM to 6AM???? anyhow. I should have included that I am using NB5.1_MP4 6/13/2006 12:02 PM >>> If you are using Netbackup 6.0
/usr/local/webapp/mharc-adsm.org/html/Veritas-bu/2006-06/msg00258.html (15,924 bytes)

2. [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included. (score: 1)
Author: scb4 at georgetown.edu (Steve Beuttel)
Date: Tue, 13 Jun 2006 12:31:04 -0400
I'm sorry ... did I read correctly that you have verified that NBU 6.0 will not allow a start window to cross midnight? And someone actually told you that was a feature because to do so is a "bad pra
/usr/local/webapp/mharc-adsm.org/html/Veritas-bu/2006-06/msg00261.html (18,144 bytes)

3. [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included. (score: 1)
Author: scb4 at georgetown.edu (Steve Beuttel)
Date: Tue, 13 Jun 2006 13:08:55 -0400
I think I may not have read correctly - this referred to Calendar-based schedules, correct? -Steve~~~~
/usr/local/webapp/mharc-adsm.org/html/Veritas-bu/2006-06/msg00265.html (19,529 bytes)

4. [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included. (score: 1)
Author: Richard.Mansell at ccc.govt.nz (Mansell, Richard)
Date: Wed, 14 Jun 2006 09:40:24 +1200
We only have one calendar based schedule (for quarterlies) and the start window spans the whole weekend. We do that as the client backups all get scheduled at the same time (Friday night) so will sit
/usr/local/webapp/mharc-adsm.org/html/Veritas-bu/2006-06/msg00279.html (12,650 bytes)

5. [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included. (score: 1)
Author: Jonathan.Marks at ftc.usda.gov (Marks, Jonathan - Fort Collins, CO)
Date: Tue, 13 Jun 2006 16:48:07 -0600
I did not have any problems with Pre 6.0 crossing the midnight boundary. -Jonathan Marks (970)295-5362 _____ goofy isn't the word I was thinking of....bad prcatice to do backups from 6PM to 6AM???? a
/usr/local/webapp/mharc-adsm.org/html/Veritas-bu/2006-06/msg00280.html (16,553 bytes)

6. [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included. (score: 1)
Author: Jonathan.Marks at ftc.usda.gov (Marks, Jonathan - Fort Collins, CO)
Date: Tue, 13 Jun 2006 16:48:06 -0600
I am not sure allow is the correct word. If I scheduled a full backup to run across midnight and checked both days in the calendar schedule then I had an issue where the backup job never ran. I did n
/usr/local/webapp/mharc-adsm.org/html/Veritas-bu/2006-06/msg00281.html (18,472 bytes)


This search system is powered by Namazu