We have a TSM Environment with two TSM Servers. One at production and another at the DR site, using HADR for the database. Looking to upgrade from 6.3 to 7.1.6. We know the process for doing fix-pack updates (shown below), but is this process also to be used for upgrading from 6.x to 7.x?
Applying Tivoli Storage Manager Server maintenance
db2stop
db2 activate db tsmdb1
db2 -hadr -db tsmdb1
Thanks in advance.
We have a TSM Environment with two TSM Servers. One at production and another at the DR site, using HADR for the database. Looking to upgrade from 6.3 to 7.1.6. We know the process for doing fix-pack updates (shown below), but is this process also to be used for upgrading from 6.x to 7.x?
Applying Tivoli Storage Manager Server maintenance
- On primary server:
- Shut down the Tivoli Storage Manager server. This will deactivate the database and stop DB2.
- Upgrade Tivoli Storage Manager to the new fix pack level using COI installation.
- Start the Tivoli Storage Manager server.
- Issue the following command to verify that HADR has resumed:
- On standby server:
- Keep HADR enabled and running until the primary server is upgraded to the new level.
- Because the standby server does not have the Tivoli Storage Manager server running, you must deactivate and stop DB2 manually using DB2 commands:
db2stop
- Upgrade Tivoli Storage Manager to the new fix pack level using COI installation
db2 activate db tsmdb1
db2 -hadr -db tsmdb1