jmroderick
Newcomer
- Joined
- May 17, 2010
- Messages
- 1
- Reaction score
- 0
- Points
- 0
Is there any way I can tell how much of a TSM incremental backup job has been completed at a point in time?
I thought TSM worked out how much had changed before starting the backup so in theory, it should be possible to know how much data there is left to backup at any time.
Thanks
I thought TSM worked out how much had changed before starting the backup so in theory, it should be possible to know how much data there is left to backup at any time.
Thanks