hi folks
seeking your assistance on this matter. i am quite confused and not familiar with TSM since i am using HP DP for almost a decade.
i am wonder why when i used inc -absoulute i had an error This node has exceeded its maximum number of mount points. but when the backup run on scheduled RUn(INCR), it completes. so i only have failed when i used inc -absolute on manual run
if i use update node <nodename> maxnummp=<value>, and i edit the default value, will the other backup/server be affected?
and is there a limit in the maxnummp? is it ok to edit the default value from 1 to 50 for example? what will be the effect on other backup/server? and is it ok to edit the maxnummp?
seeking your assistance on this matter. i am quite confused and not familiar with TSM since i am using HP DP for almost a decade.
i am wonder why when i used inc -absoulute i had an error This node has exceeded its maximum number of mount points. but when the backup run on scheduled RUn(INCR), it completes. so i only have failed when i used inc -absolute on manual run
if i use update node <nodename> maxnummp=<value>, and i edit the default value, will the other backup/server be affected?
and is there a limit in the maxnummp? is it ok to edit the default value from 1 to 50 for example? what will be the effect on other backup/server? and is it ok to edit the maxnummp?