TSMstarter
Active Newcomer
- Joined
- Aug 25, 2010
- Messages
- 28
- Reaction score
- 0
- Points
- 0
I use TSM for Sharepoint. Now I have a Problem. If i save lists with a lot of entries (higher than 1k), then the Schedule needs a long time. The Schedule starts normal, suddenly the process bar stop and after a long time (ca 30-60 mins) the process is finish. First i think this is normal, but the save data are only 1-2 MB. A other Schedule that have more list and data (200 MB), but under 1k entries needs only 15 minutes.
What can I do with DocAve that the back up runs faster?
//Edit
with entries i mean "items"
What can I do with DocAve that the back up runs faster?
//Edit
with entries i mean "items"
Last edited: