chico
ADSM.ORG Member
HI everyone from Chico !
i got a strange pbs with my TSM : got a LTO (3580) one drive. I have defined 10 sequential access volume in the primary stgpool (lto_monday, lto_tuesday....... --> no pbs
but when the backup begin, TSM mounted the friday volume but i gave it the monday volume which it is correctly labelled, just the one where i want the backup goes on
but i want it to mount the monday volume on monday, so i got to del the volume and recreate them with 1lto_monday, 2lto_tuesday, and so and so
the stgpool contains 10 volumes but TSM does not want to mount the monday on monday, it took the first it find and after 30 seconds put the volume 'unavailable', and requires another one
what do i wrong for it does not take on monday the monday volume, the first on the list i gave to it ?
the french (it is me) will going crazy soon
so a small heelp will be sincerly appreciate
i got a strange pbs with my TSM : got a LTO (3580) one drive. I have defined 10 sequential access volume in the primary stgpool (lto_monday, lto_tuesday....... --> no pbs
but when the backup begin, TSM mounted the friday volume but i gave it the monday volume which it is correctly labelled, just the one where i want the backup goes on
but i want it to mount the monday volume on monday, so i got to del the volume and recreate them with 1lto_monday, 2lto_tuesday, and so and so
the stgpool contains 10 volumes but TSM does not want to mount the monday on monday, it took the first it find and after 30 seconds put the volume 'unavailable', and requires another one
what do i wrong for it does not take on monday the monday volume, the first on the list i gave to it ?
the french (it is me) will going crazy soon
so a small heelp will be sincerly appreciate