jimmytandon
Active Newcomer
- Joined
- Oct 8, 2012
- Messages
- 35
- Reaction score
- 0
- Points
- 0
Hi,
I m using 3 lto tapes for dbbackup, and I have scheduled admin backkup in every 3 days
But suddenly my activity log drive showing me full, and I want to take dbbackup manuly but dbbackup required a scratch volume or tapes.
So my query is can I manually scratch those existing tape volume if yes so what will the procedure....
Thankssss
Ravi tandon
I m using 3 lto tapes for dbbackup, and I have scheduled admin backkup in every 3 days
But suddenly my activity log drive showing me full, and I want to take dbbackup manuly but dbbackup required a scratch volume or tapes.
So my query is can I manually scratch those existing tape volume if yes so what will the procedure....
Thankssss
Ravi tandon