Hello, I have an open PMR with IBM regarding a .DSS file issue and while researching the issue for us, the IBM Support Tech looked into our current tape volume setup and told us that we are handling our DBB and DBS tape volumes incorrectly. I wanted to check here and see if he is correct.
We currently run a DBS backup to tape and send it offsite everyday with a 7 day retention.
We also run a DBB backup daily that stays in our library with a 7 day retention.
He says that we should be sending the DBB backup offsite and keeping the DBS backup onsite. Is that correct ?
Thank you
We currently run a DBS backup to tape and send it offsite everyday with a 7 day retention.
We also run a DBB backup daily that stays in our library with a 7 day retention.
He says that we should be sending the DBB backup offsite and keeping the DBS backup onsite. Is that correct ?
Thank you