DRM Configuration

waz

ADSM.ORG Member
Joined
Jun 2, 2016
Messages
11
Reaction score
0
Points
0
PREDATAR Control23

Hi Everybody,

I have an installed tsm 7.1.3 server with Operation Center and i have just began the DRM configuration.
Every Monday, I want to outsource the last week backup ,so I want to know if I have to set the value DBbackup series expirations days at 8 or 7 ?

Also,i would like to know in case of disaster what files i would need other than volhist.out and devconfig.out?

Thanks in advance for your help.
 
PREDATAR Control23

Using DRM, you need to do a "prepare" command and save this aside from the device configuration and volume history. By the way, exploding the resulting file from prepare also has the device configuration and volume history.

Use 8 days
 
  • Like
Reactions: waz
Top