Hi All ,
We are shutting down the TSM server in Site A . So we have another TSM server in Site B. There are 5 nodes have long term retention data and size of data 25 TB. We have not very good band with from two sites. Both Source and destination servers have 5.5 V. Please advise which is best method to migrate the data quickly.
Thanks,
Frank
We are shutting down the TSM server in Site A . So we have another TSM server in Site B. There are 5 nodes have long term retention data and size of data 25 TB. We have not very good band with from two sites. Both Source and destination servers have 5.5 V. Please advise which is best method to migrate the data quickly.