We are facing a challenge on backing up our weekly data into the tape with the designed of our current setup. Here is our current configuration:-
Backup Server : p610 (AIX v5.2), with 1 processor and 1 GB of memory
Host agent to be backup: 16 consists of Windows, AIX Linux with Domino, Oracle and DB2 database
Total Disk Storage: 3 TB
Total Disk Usable : 2 TB
Total Disk for Weekly Backup: 1.6TB
Total Disk pool allocate in TSM Server: 200GB
Tape Library model : LTO 3582-L23 (2 x drives)
We always encounter TSM storage pool allocation full before the migration of the data from storage pool to tape clear up the space for the backup process to carry on.
What is the best design of the backup approach with further invest on hardware?
Regards,
Very concerned Falcon73
Backup Server : p610 (AIX v5.2), with 1 processor and 1 GB of memory
Host agent to be backup: 16 consists of Windows, AIX Linux with Domino, Oracle and DB2 database
Total Disk Storage: 3 TB
Total Disk Usable : 2 TB
Total Disk for Weekly Backup: 1.6TB
Total Disk pool allocate in TSM Server: 200GB
Tape Library model : LTO 3582-L23 (2 x drives)
We always encounter TSM storage pool allocation full before the migration of the data from storage pool to tape clear up the space for the backup process to carry on.
What is the best design of the backup approach with further invest on hardware?
Regards,
Very concerned Falcon73