ANS0326E (RC41) This node has exceeded its maximum number of mount points.

influx

Active Newcomer
Joined
Jun 5, 2007
Messages
258
Reaction score
0
Points
0
Hoping someone can help. I know what this message means, however, the dba insists he's not launching more sessions than the assigned mount points. I'm not seeing anything in the TSM logs to indicate an issue. Also, they see this quite frequently.

backup failed - ANS0326E (RC41) This node has exceeded its maximum number of mount points.
 
Harry, Toxy... thanks for info, will make config changes and advise.
 
Harry... Toxy... Here's the follow up. Increased mountpoints on TSM server to 8. DBA is opening 4 channels. Still failing on the following:
ANS0326E (RC41) This node has exceeded its maximum number of mount points.
Any suggestions, or is it trace/pmr time?
 
Back
Top