DanGiles
ADSM.ORG Senior Member
TSM server 8.1.0.009.
TSM for VMware 8.2.2.0
I understand tagging and scheduling for VMs in general. Our requirement is that we should be able to separate out production and dev clusters (prod machines having a higher priority). Since schedule assignment and load balancing between proxies is done at the data centre level, how can I assign sched/proxies to some clusters and other sched/proxies to other clusters? (Note: manually changing these on a guest-by-guest basis is NOT an option!)
TSM for VMware 8.2.2.0
I understand tagging and scheduling for VMs in general. Our requirement is that we should be able to separate out production and dev clusters (prod machines having a higher priority). Since schedule assignment and load balancing between proxies is done at the data centre level, how can I assign sched/proxies to some clusters and other sched/proxies to other clusters? (Note: manually changing these on a guest-by-guest basis is NOT an option!)