Hi Kevin
I do not want to be a downer on Clustering, as I quite like MS
Clustering, but the reason why I would be looking at Clustering the Master is
due to "High Availability" of that application.
However, please bear in mind that if you have 1000+ jobs
running while the Master Cluster fails over, the application will stop. This
will result in potentially failed backups, client timeout / disconnects and the
potential to restart failed jobs if the retry limits been
reached.
Would it be worth considering a seperate Media Server to take
the load off the Master? And using Shared Storage Option (SSO) for access to the
Drives and Library? I do apprecaite it may be more of a cost to the company
(where Clustering is free out of the box), but it is an
option.
Have you read the NetBackup High Availability
Guide?
Regards
Simon
Anybody running a clustered 6.5.x or 7.0 master on Windows
2003 or 2008 with MSCS?
Looking at this option for a new 10,000+ job per night
master.
Any comments are appreciated.
This message is private and confidential. If
you have received it in error, please notify the sender and remove it from your
system.
This email (including any attachments) may contain confidential
and/or privileged information or information otherwise protected
from disclosure. If you are not the intended recipient, please
notify the sender immediately, do not copy this message or any
attachments and do not use it for any purpose or disclose its
content to any person, but delete this message and any attachments
from your system. Astrium disclaims any and all liability if this
email transmission was virus corrupted, altered or falsified.
-o-
Astrium Limited, Registered in England and Wales No. 2449259
Registered Office:
Gunnels Wood Road, Stevenage, Hertfordshire, SG1 2AS, England |
|