We have a duplicate NBU master server at a third part site
that we use for DR. We’re recently upgraded to 6.5.4 in production
and wanted to upgrade the DR master server before an upcoming test. We
made the mistake of deleting all the images from master server prior to
starting the upgrade and this has basically hosed the EMM database to the point
where neither the upgrade to 6.5.4 or the uninstall scripts for 6.5.1 keep
failing.
We thought we would be able to restore a catalog and it’s
associated images to get a working EMM database but because the catalogs have
been backed up with NBU 6.5.4 and the master server we’re trying to
import them to is at 6.5.1 this isn’t working either.
What are the risks associated with deleting the
/usr/openv/netbackup directory so we can do a fresh install of NBU 6.5 and then
patch it to 6.5.4 ? What other directories or files would I need to
remove from this duplicate server before trying to install from scratch ?
Thanks in advance,
Mark Glazerman
Enterprise Storage Administrator
Spartech Corporation
Desk: 314-889-8282
Fax: 314-854-8282
Cell: 618-520-3401
mark.glazerman AT spartech DOT com
http://www.spartech.com
P
please don't print
this e-mail unless you really need to
This
e-mail and any files transmitted with it are confidential, are intended solely
for the use of the addressee, and may be legally privileged. If you have
received this email in error please notify the sender immediately, and do not
copy or forward it.