Re: [Veritas-bu] Multiple jobs running
2007-06-21 11:50:25
Out of curiosity, what did you upgrade from?
If 5 or earlier, there is a difference in parent/child job control in 6.
Jason
> -----Original Message-----
> From: veritas-bu-bounces AT mailman.eng.auburn DOT edu
> [mailto:veritas-bu-bounces AT mailman.eng.auburn DOT edu] On Behalf
> Of Wooten, FH Frank @ IS
> Sent: Thursday, June 21, 2007 8:56 AM
> To: veritas-bu AT mailman.eng.auburn DOT edu
> Subject: [Veritas-bu] Multiple jobs running
>
> We have just upgraded to 6.0 mp4. One thing I have noticed is
> that I'm seeing a policy run multiple times through out the
> schedule. I have one policy that backs up 2 drives and it
> backed up the same to drives 10 times successfully. Just
> wondering if this is a bug with the new software or something
> new with scheduling.
>
> Thanks
> Frank
>
> Frank Wooten
> E-mail Server Group
> L-3 Integrated Systems
> 903-457-3934
>
>
>
>
smime.p7s
Description: S/MIME cryptographic signature
_______________________________________________
Veritas-bu maillist - Veritas-bu AT mailman.eng.auburn DOT edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
|
|
|